FILTRONA

Back to Our Work

Specialty plastic molding, Pharmaceutical grade tubing.

Design of new structural steel to support the cleanroom ceiling, duct work, mechanical piping, electrical, process, and an airlock.

Relocated existing process cooling water and compressed air from another plant.

Reinstalled and tied into the new process distribution system.

Ran new 1,800 amp sub panel off the existing primary gear and distributed for each of the process lines, and for the HVAC and new process system.

Installed IPA exhaust system through a water based scrubber, PVC coated ductwork, Neiderman exhaust arms, and a duct static controller to ramp up the VFD on the exhaust fan as usage was increased or decreased.

Design/Build office expansion exterior to the warehouse, and 1,800sf of office space in a structural steel building with metal panel exterior.

  • LOCATION

    Athol, MA
  • INDUSTRY

    medical-device
  • PROJECT TYPE

    Design/Build
  • ISO CLASS

    ISO 7 and ISO 8
  • SIZE

    10,000 sf
  • PROJECT SCHEDULE

    4 months
  • PROJECT COST

    $2,500,000